Case Study

MOVING NEW BELLOWS INTO POSITION FOR ENTERING THE TURBINE HALL

Case Study: Fabrication & Onsite Specialist Services Removal of flanged expansion bellows

Check out our latest case study detailing the ‘removal and replacement of flanged expansion bellows, both weighing 5829kg. Both our fabrication and onsite specialist teams were required to deliver the scope of work, which included a range of services including project management, fabrication, pre work, pipework removal, machining, rigging, bellow modifications, machine facing as well …

Case Study: Fabrication & Onsite Specialist Services Removal of flanged expansion bellows Read More »

Boat shaft

Case study: Spiral Welding & Onsite Machining on an urgent boat lift shaft repair

Check out our latest case study detailing a recent ‘Spiral Welding & Onsite Machining’ scope of work carried out on an urgent boat lift shaft repair. Due to a collapsed wheel bearing and extensive corroding due long durations in salt water, the boat shaft had substantial damage and needed to be removed from the boat …

Case study: Spiral Welding & Onsite Machining on an urgent boat lift shaft repair Read More »

Spiral Welding & In-situ Machining

Case Study: Spiral welding & In-situ machining on an emergency hopper brake down

Check out our latest case study on an urgent ‘spiral welding & In-situ machining’ scope of work carried out on our client’s emergency hopper brake down. Working with global manufacturer of portable machining equipment, Climax, a safe and swift solution was found. The hopper was back in operation with minimal down time and within schedule, …

Case Study: Spiral welding & In-situ machining on an emergency hopper brake down Read More »

Case Study: Onsite Machining on a new build research vessel

Check out our latest case study on a recent Onsite Machining scope on a new build research vessel. Working closely with the client and global manufacturer of portable machining equipment, Climax, a bespoke solution was developed. Despite access constraints, extremely accurate boring requirements and a demanding schedule, the team successfully delivered the project within five …

Case Study: Onsite Machining on a new build research vessel Read More »

Scroll to Top